Cardiff to Exeter
£320 to £1,220
107 miles, a little over two hours each way. The figure depends entirely on the size of the load, and the table below breaks it down.
Two things are new this winter: a 24 hour closure at the Almondsbury interchange near Bristol from December, and camera enforcement at Exeter's bus gate and bus lanes. Both are worth knowing about before you book a date.
What it costs by size of load
Indicative local prices for each size of move, plus the mileage for this route. The same figures apply in the other direction, because the van makes both legs either way.
| Job | What it covers | Indicative price |
|---|---|---|
| Studio or bedsit | A single room of furniture and boxes, one van, one trip. | £320 to £540 |
| One bedroom flat | Bed, sofa, wardrobe, white goods and the boxes that come with them. | £370 to £620 |
| Two bedroom flat or house | Two bedrooms of furniture plus a living room and kitchen, usually a full van. | £450 to £750 |
| Three bedroom house | A family house, often a large van or two runs depending on the loft and garage. | £580 to £970 |
| Four bedroom house | A big load with a second crew member, and nearly always more than one trip. | £740 to £1,220 |
The route south and the Almondsbury closure
The usual run is east on the M4 over the Prince of Wales Bridge, then south on the M5 past Bristol and Taunton to Exeter, where the A38 takes over for moves on to Plymouth. Google Maps offers two ways onto the M5: through the M4 and M5 interchange at Almondsbury, or on the M49, which joins the M5 further south.
National Highways is carrying out £4.5 million of permanent repairs at Almondsbury from September 2026 to February 2027, following emergency fixes in 2024. From December 2026 to February 2027, the link from the M4 eastbound to the M5 southbound is closed 24 hours a day, with traffic diverted via junction 14 of the M5, which adds about 15 minutes off peak. The M49 route does not use the closed link, so the moving partner can weigh up both on the day.
Roadworks on the M5 in Somerset and Devon
Between junctions 25 and 26, near Taunton, National Highways started replacing the central barrier on 2 November 2026, and the work is planned to finish by the end of July 2027. Until March 2027 the motorway is down to two lanes each way with a 50mph limit, and after that three narrow lanes run each way, still at 50mph.
Closer to Exeter, barrier replacement between junctions 29 and 31 runs from May 2026 to March 2027. Most of it is done overnight, usually Sunday to Thursday, with temporary speed limits and some overnight or weekend slip road closures. A daytime move meets lane restrictions rather than closures, but it is worth allowing extra time.
Exeter's bus gate and bus lane cameras
Devon County Council has started camera enforcement at four places in Exeter: the Wonford Road bus gate from 1 October 2025, the Topsham Road and Cowick Street bus lanes from 8 December 2025, and the Fore Street bus lane in Heavitree from 1 May 2026. A van that drives through gets a penalty charge of £70, reduced to £35 if paid within 21 days.
First offences in the six months after each camera went live brought a warning notice instead of a charge, and that period has now passed at all four sites. If either Exeter address is near one of these roads, mention it when you enquire so the moving partner can plan the approach.
Parking and loading in Exeter
Devon County Council is the highway authority for Exeter's streets. Its trade permits page says moving house does not need a trade permit, because sign-written removal vans can load and unload unless loading is restricted. If the moving partner's van has no signwriting, ask whether it needs anything extra.
Where a van has to stand on yellow lines, the council sells parking waivers at £10 a day or £30 a week, bought at least 48 hours ahead and granted only where parking there is safe and necessary. A waiver is for a specific location and is not valid in off-street car parks. The council presents waivers for trades, so ask the moving partner whether one applies to your move.
No clean air charge in Exeter
Exeter does not have a Clean Air Zone and is not among the seven charging zones on GOV.UK's list. The motorway passes Bristol without entering its zone, so a Cardiff to Exeter move does not pay a clean air charge. Our Cardiff to Bristol page covers Bristol's zone for moves into the city.
For the move itself, the price on this page is the local band for the load plus the mileage, and a local moving partner confirms the figure. Students moving to or from Exeter can use the same route; our student moves page covers smaller loads.
What the price includes
- The van, the fuel and the driver
- A driver who carries, loads and stacks rather than watching you do it
- Blankets, straps and trolley to protect what is being moved
- Loading and unloading at both ends, including stairs
- The parking sorted before the day rather than argued about on it
Third-party charges such as clean air zones or parking permits are not included unless the mover says so in your quote. Ask the mover so it is stated either way.
Other routes from Cardiff
Moving from anywhere in Cardiff
We pass on enquiries from any part of the city, including Cardiff City Centre, Cathays, Roath, Canton, Grangetown, Splott. See how long distance moves work or the local price list.
Moving between Cardiff and Exeter?
Send both postcodes, the access at each end and a rough list of what is moving. We will pass it to a local moving partner, who confirms one figure for the whole trip.